Design and Application to Upgrade of Yarevan and new lighting design and installation Works of the Football Academy |
| |
|
|
| Customer |
: |
Yerevan Football Academy |
| Work Location |
: |
Yerevan, Armenia |
| Start Date |
: |
5 /
3 /
2010 |
| End Date |
: |
26 /
9 /
2010 |
| Covered Area Size |
: |
|
|
|
| |
|
| |
The scope of Works include the design and installation Works of the Public Stadion in Yerevan to upgrade the lighting conditions of the lighting system and level to comply with the UEFA standards Class IV specification and renovation of the distrubition panels. The capacity of the stadion is 15.000 seats. The existing 1500 W, 315 lighting fixtures and related distrubition panels are replaced with 2000 W, 280 pcs of lighting fixtures with related panels. 4 pole-panels are replaced with the new ones. The lighting automation system is re-designed to control the complete lighting system from one center. The lighting Works of the Training Center includes the the design, Material supply and installtion of 6 poles 15 mt, 50 pcs 2000 W lighting fixtures, 6 pole-panels, 1 pc of main distribution & control panel, 1.500 mt of power cabling. |
| |
|
|